Reinforcement fixed to the drawing, ready for the pour.
MA Steelfixing supplies skilled steelfixers for civil, infrastructure, commercial and residential work. Hire us by the hour, or send your drawings and we will price the whole job.
Over 10 years fixing steel for hundreds of customers
1250 t fixed at Pancras Square, King’s Cross
England and Scotland civil, commercial and residential
Hourly or priced from your drawings and bending schedules
A team you can trust
We have delivered steelfixing to hundreds of satisfied customers for more than 10 years. Our management team knows steelfixing, knows the construction industry and knows the business.
Our steelfixers are highly skilled trade professionals. We give them safe, secure working conditions, and in return they are a dedicated and loyal workforce. For you, that means good productivity and good workmanship.
We have worked on college buildings, car parks, residential blocks, hotels, schools and shopping centres.
General notes
- All work is carried out under our Occupational Health, Safety and Environment Policy.
- Every site has its own Health and Safety Management Plan.
- Formal risk assessments and method statements are provided before we start.
- Job safety and environmental analysis procedures are followed on every job.
- Health and safety requirements are always under review.
Schedule of work
Six kinds of work, from a single cage of steel to a full frame. Hourly or priced.
| Mark | Element | What we do |
|---|---|---|
| S1 | Steel fixing | Cutting, placing and tying reinforcement to your drawings and bending schedules, with cover and spacing checked before the pour. |
| S2 | Slabs, columns and walls | Suspended slabs, stress decks, columns, walls and lift shafts, on frames of every size. |
| S3 | Foundations and ground beams | Footings, bases and ground beams, fixed to programme so the groundworks keep moving. |
| S4 | Civil engineering | Bridges, tunnels, archways, roads and detention tanks for infrastructure contractors. |
| S5 | Specialist structures | Stairs, swimming pools and other one-off pours where the detail matters. |
| S6 | Labour supply | Experienced steelfixers on an hourly rate, or the whole package priced from your drawings. |
We also fix bridges, tunnels, suspended slabs, archways, walls, lift shafts, footings, stress decks, columns, stairs, roads, detention tanks and swimming pools.
Drawing register
Recent and current work. Tonnages are for steel we fixed.
| No. | Project | Client | Main contractor | Steel | Status |
|---|---|---|---|---|---|
| MA-001 | King’s Cross – Pancras Square | Goold Max | Bam | Ongoing | In progress |
| MA-002 | King’s Cross – Pancras Square London + Tunnel | Goold Max | Bam | 1250 t | Complete |
| MA-003 | DP World East Anglia & Essex | Fortel | Bachingham | 550 t | Complete |
| MA-004 | Tambrige wells | Goold Max | Bam | 180 t | Complete |
Where we work
Main contractors and developers across four sectors.
Residential
Houses, apartment blocks and student accommodation.
Commercial
Offices, hotels, schools, colleges and shopping centres.
Industrial
Warehouses, car parks, ports and logistics sites.
Civil engineering
Bridges, tunnels, roads and detention tanks.
From drawings to pour
How a job runs with us, start to finish.
- Send your drawings Email your drawings or bending schedules, or attach them to the enquiry form.
- We price the job An hourly rate or a fixed price, with method statements and risk assessments ready.
- We fix on site A skilled, safe team working to your programme and your drawings.
- Ready for the pour Checked and handed over, ready for inspection and the pour.